Ghana steel tower production and plating plant business feasibility study
Business period |
2010. 05. 07 ~ 2010. 11. 06 |
Total project cost |
97,100 k KRW |
Clients |
KOPIA |
Contents |
The Ghana State Power Authority plans was planning to build a national transmission and substation network through the construction of a gas-fired power plant using natural gas drawn from the western coastal area of Ghana. A F/S Study had been undertaken analysing the feasibility of building a local steel tower and plating factory.
|